A selection of water main, sewer, pressure sewer and chlorinator estimates from New South Wales, Victoria and Queensland. Client names, addresses and prices are left out on purpose. We don't publish anyone's job, and we won't publish yours.
Staged residential estates, where the price usually rests on how well the bill of quantities matches the drawings.
Potable water and wastewater packages for staged subdivisions in Sydney's south-west growth area, from Sydney Water approved designs.
A high-pressure gas main running through one estate. Work near it follows a coordination plan, which has to be allowed for in method and productivity along that length.
New mains, renewals and panel rates, for Sydney Water, regional councils and Victorian water authorities.
A Sydney Water water main on a busy state road, from the authority's design package.
The costs that sit outside the pipe: Sydney Water's cut-in and connection charges, invoiced separately at the end, and the deed poll and inspection plan needed before the design is released for construction.
Schedule of rates submissions for water main renewal panels in regional Victoria.
A rate on its own invites argument later. Rates were built from first principles, and for one panel we wrote a basis of pricing: what every rate includes, what it excludes, and the conditions it holds under.
Gravity and pressure sewer, including extensions where most of the pipe is bored rather than trenched.
“We recently used Shoaib And the team at WSE for a tender on a Sewer project The tender was returned on time within a few days ,calculations and details were extensive and detailed WSE’s expertise was invaluable for this tender”
A private pressure sewer designed to WSA 04, the sewage pumping station code, with an approved Sydney Water design.
Testing is a real cost line: the design calls for compaction tests at set spacings in both the pipe embedment and every trench fill layer. We also raised RFIs on the design before pricing it.
Rising mains, pump and grease arrestor works, and chlorinator station civil works.
Water, sewer, a rising main and pump and grease arrestor works for a carpark package on a major infrastructure site.
Tier-one site costs that a smaller contractor can miss: worker and plant registrations on the project's safety systems, GPS tracking for plant and people, and electronic dockets, all written into the scope as the contractor's cost.
Civil and FRP works for chlorinator stations at several sites in a water utility program, priced as individual site estimates.
Each site had its own layout, access and existing services, so each was priced on its own rather than copied from the first.
“Shoaib and the team at WSE Sydney have been outstanding to deal with. Their service is highly professional, responsive, and delivered in a timely manner. Communication was clear throughout the process, and they demonstrated a strong understanding of project requirements and practical site constraints. We value their reliability and attention to detail and look forward to teaming up with WSE Sydney on future projects. Highly recommended.”
“We’ve had a great experience with WSE Sydney. Shoaib is professional, responsive, easy to deal with and has delivered high-quality work for us. I highly recommend Shoaib for anyone looking for reliable estimating services.”
“Detailed quote and pricing 👍”
Word for word from our Google reviews. Read them on Google →
Send the drawings and the closing date. We acknowledge within two hours during AEST business and agree a fee and delivery date before any work starts.